Publications

Licences To Alter Do You Really Need a Surveyors’ Report
The future’s bright the future’s “Green”
Historic Repairs
Principles of Repair for Historic Buildings
5 Golden Rules
Licence To Alter Top 5 Golden Rules
Fire Door Checklist
Fire Door Checklist
The Role of the Surveyor In Flood Reinstatement
The Role of the Surveyor In Flood Reinstatement
Contract Administration
What is Contract Administration?
Running Out of Time
Running out of Time (And Energy)
Powder Coated Windows
Looking after Powder Coated Windows
The Challenges of Asbestos Removal - Residential Common Parts
The Challenges of Asbestos Removal – Residential Common Parts
The Role of the Principal Designer
The Role of the Principal Designer
Checklist
Licence for Alteration Checklist for Surveyors
Checklist
Licence for Alteration Checklist for Clients & Property Managers
Road Map For Licence To Alter – Flow Chart
Road Map For Licence To Alter – Flow Chart
Harris Associates Example LTA Proforma 2016
Licence for Alteration Proforma
Top 5 most Inappropriate works carried out to Historic Buildings
Top 5 most Inappropriate works carried out to Historic Buildings
Hydraulic Lime and Non Hydraulic Lime
Hydraulic Lime and Non Hydraulic Lime
No Your Limits
Know Your Limits
Stop The Rot
Rot have we here?
Lights
Act Now to Keep the Lights On
Wind in our sails
The Wind in our Sails
R22 - Time to Start Planning
R22 – Time to Start Planning
R22 - Dilapidations Time Bomb
R22 – Dilapidations Time Bomb
Top 5 Eco Innovations for 2016
Top 5 Eco Innovations for 2016
''4 Phase Supply'' Build To Rent
“4 Phase Supply” Build To Rent
Build to Rent
An Introduction to UK Private Rented Sector & Build to Rent
Complaints Procedure 2015
Complaints Handling Procedure